When I where to file down the second front frame tube after welding he sat across my upside downed frame for two long hours making it more stable. His only award for this heroic act was getting allowed to perform som stunt welding on a piece of scrap metal. As my frame is now considered done I found next task was to start working with brake pedal and linkages. To get back decent play in the brake pedal both the support plate shaft and the bush in the pedal was replaced, I cant stand a wiggly brake pedal. 1/10 of a mm play is great :-), when greased it feels very direct.






0 comments:
Post a Comment